3.3.2 Concept, Flow and Design of Application #56

Closed davinlim23 closed 10 months ago

davinlim23 commented 10 months ago

Description of the task: This task involves the accurate documenting of the concept, flow and design of the application and how it corresponds and fulfills all use cases.

Goal of the task: The goal of this task is to ensure that the application is representative of all requirements provided by the client to ensure that the app is fully functional.

Success of this task is dependent on the correct description of the concept, flow and design of the application and proper explanations on why specific features are implemented as per client requirements.

Allocated time: 4 days

Start Date: 14/11/2023 End Date: 21/11/2023

Owner: Ng Zi Bin Status: In Progress

Priority: High

ZIBINNG commented 10 months ago

In completing the task, detailed documentation was produced to define the application's concept, user flow, and design, ensuring alignment with client requirements. The documentation features clearly articulated relationships between the boundary, control, and entity classes, with well-encapsulated attributes and methodical access via control classes. The user interface, represented by boundary classes, was designed to facilitate user interaction seamlessly.

This documentation phase was conducted within the expected time frame, adhering to the planned schedule. The timely completion of this task contributes positively to the project's momentum, ensuring that the team remains on course for the upcoming milestones in M3.

By fulfilling all the objectives outlined for this task, including a precise explanation of the application's concept, flow, and design, and a clear justification for each feature, this task is now ready to be closed.

Start Date: 14/11/2023 End Date: 21/11/2023