Closed ivandank12 closed 8 years ago
Sorry this is not clear to me, can you be more definite with the problem is? For example in the high level requirements or in some operation. Also, the operation is now called eneableReporting.
For the first point, now there is an Enable Reporting operation it is clearer. For the second point – It is not clear what ‘statistics link status’ is – the term is not used elsewhere. For the third point – high level requirements clause n)b) –states evaluating the parameter statistics should continue. How can this be tested if there is no reporting? Why is it necessary?
So these are all in the high level requirements section?
Sorry yes
Only outstanding issue is High level requirement (n) clause - b. continue evaluating the parameter statistics.
It is assumed this should be - stop the evaluation of statistics
No, it should continue the evaluation, just not report the result. Most likely it is because it will be switch on at a later date.