Describe the bug
Overseas transport details - Distance (overseas) field and Vehicle (overseas) field are displayed as mandatory fields to be filled. The user cannot proceed with the data entry if they do not complete these fields. Overseas transport details - Distance (overseas) field and Vehicle (overseas) field SHOULD NOT be marked as mandatory. These are only optional fields to be filled by the user if imported materials are used. This issue is present in Substructure, Superstructure, Internal and external finishes and so on.
To Reproduce
Steps to reproduce the behavior:
Open B-SAT > Substructure/ Superstructure (Main phases) > Sub phases ( Walls and facades etc)
Expected behavior
When users make a material entry under all main phases and sub phases only the local transport detail entry (Local distance/ Local vehicle) should be mandatory and compulsory to be filled. Overseas transport components ( Overseas distance/ Overseas vehicle) should not be mandatory fields to be filled. The user should be able to leave these two fields blanks ( Overseas distance, Overseas vehicle), save the project and proceed.
Screenshots
Desktop (please complete the following information):
OS: [Microsoft Windows]
Browser [Chrome]
Version [e.g. 22]
Smartphone (please complete the following information):
Device: [e.g. iPhone6]
OS: [e.g. iOS8.1]
Browser [e.g. stock browser, safari]
Version [e.g. 22]
Additional context
Add any other context about the problem here.
Describe the bug Overseas transport details - Distance (overseas) field and Vehicle (overseas) field are displayed as mandatory fields to be filled. The user cannot proceed with the data entry if they do not complete these fields. Overseas transport details - Distance (overseas) field and Vehicle (overseas) field SHOULD NOT be marked as mandatory. These are only optional fields to be filled by the user if imported materials are used. This issue is present in Substructure, Superstructure, Internal and external finishes and so on.
To Reproduce Steps to reproduce the behavior: Open B-SAT > Substructure/ Superstructure (Main phases) > Sub phases ( Walls and facades etc)
Expected behavior When users make a material entry under all main phases and sub phases only the local transport detail entry (Local distance/ Local vehicle) should be mandatory and compulsory to be filled. Overseas transport components ( Overseas distance/ Overseas vehicle) should not be mandatory fields to be filled. The user should be able to leave these two fields blanks ( Overseas distance, Overseas vehicle), save the project and proceed.
Screenshots
Desktop (please complete the following information):
Smartphone (please complete the following information):
Additional context Add any other context about the problem here.