Describe the bug
This is an issue that did not occur before. (Evidence - refer to the screenshots attached that were taken before in student projects and by Prof shiromi).
The final results in the construction phase should be displayed sub phase wise- Earthworks, substructure, superstructure, Construction site operations and so on along with the machinery, material , transportation, energy and water contribution.
Describe the bug This is an issue that did not occur before. (Evidence - refer to the screenshots attached that were taken before in student projects and by Prof shiromi). The final results in the construction phase should be displayed sub phase wise- Earthworks, substructure, superstructure, Construction site operations and so on along with the machinery, material , transportation, energy and water contribution.
As of now the results are displayed as big block for the entire phase final.results-subheading.docx Group 5-component 2.pdf
To Reproduce Steps to reproduce the behavior:
Expected behavior A clear and concise description of what you expected to happen.
Screenshots If applicable, add screenshots to help explain your problem.
Desktop (please complete the following information):
Smartphone (please complete the following information):
Additional context Add any other context about the problem here.