Sanjel-Energy-Services / eService_WorkItems

0 stars 0 forks source link

eService Missing Mandatory Flag #179

Open JasonSchneider19 opened 6 months ago

JasonSchneider19 commented 6 months ago

As a supervisor, while creating a job package the volume pumped is a mandatory field, but it is not flagged as being mandatory. Leaving the volume pumped empty, the following error shows up: image The volume pumped is required for all cements (Lead 1, Lead 2, Lead 3, Lead 4 and Tail) image

Once the volume pumped is entered, image the job package can move through as expected. Expect it to be similar to the following: image

wistaria623 commented 5 months ago

Volume Punmped is flagged as being mandatory. A red flag is added to the Volume Punmped lable

step:

  1. create job package from local
  2. save success
  3. update the create job package
  4. Pumping service report section-->Products -->Acids/Blends/Fluids-Base section,
wanghuan69 commented 4 months ago

开发分支验证通过