Sanjel-Energy-Services / eService_WorkItems

0 stars 0 forks source link

Pressure Test Status #180

Open awangatsanjel opened 3 months ago

awangatsanjel commented 3 months ago

And status to Pressure Test Job.

InProgress, after the pressure test button is pressed, a pressure test job is In Progress. Complete, after the end time is filled in a pressure test job, status is set as Complete. Transmitted, based of pressure test start/end time, against the PLC data transmission timestamp, if all PLC data of a pressure test job are transmitted, status is set as Transmitted.