SiEPIC / openEBL-2024-10-SiN

Submission for fabrication of silicon photonics for the openEBL Silicon Nitride run, siepic.ca/openebl
MIT License
1 stars 11 forks source link

Add files via upload #6

Closed omidesml closed 6 days ago

github-actions[bot] commented 6 days ago

Welcome, new contributor!

Thank you for uploading your design.

If you have not already checked it, please run the SiEPIC Functional Verification in KLayout, using the menu SiEPIC-Verification-Functional Layout Check (V).

Please note that we have added a new rule (on May 2, 2024) to SiEPIC-Tools and the EBeam PDK, so please make sure your tools are running the latest version. The rule is: The grating coupler spacing (pitch) must be at least 60.0 microns. This is to help avoid the probe station from accidentally aligning to an adjacent circuit.

You may continue making updates to your design, or even contributing additonal designs (using a separate file name), until the tape-out deadline.

github-actions[bot] commented 6 days ago

Welcome, new contributor!

Thank you for uploading your design.

If you have not already checked it, please run the SiEPIC Functional Verification in KLayout, using the menu SiEPIC-Verification-Functional Layout Check (V).

Please note that we have added a new rule (on May 2, 2024) to SiEPIC-Tools and the EBeam PDK, so please make sure your tools are running the latest version. The rule is: The grating coupler spacing (pitch) must be at least 60.0 microns. This is to help avoid the probe station from accidentally aligning to an adjacent circuit.

You may continue making updates to your design, or even contributing additonal designs (using a separate file name), until the tape-out deadline.

github-actions[bot] commented 6 days ago

Welcome, new contributor!

Thank you for uploading your design.

If you have not already checked it, please run the SiEPIC Functional Verification in KLayout, using the menu SiEPIC-Verification-Functional Layout Check (V).

You may continue making updates to your design, or even contributing additonal designs (using a separate file name), until the tape-out deadline.