Project Objectives - A case study for peanut (Arachis hypogaea).
Project Description -1 variety x 12 planting dates. (12 plots).
Field size: L 66' x W 56'. (0.1 ac).
Plot size: L 12' x W 25'. (300 sqft).
Field Design - RCB with 4 reps. Blocked by replication.
Field Diagrams - Maps can be found on TEAMS.
Projected Start Date- September
Projected End Date- ongoing.
Project Manager(s)- Da-Young, Daniel
Projected Planting Date- September 21st, 2022.
Crop(s)- Peanut (Arachis hypogaea).
Irrigation - Layflat to Drip tape.
Applications - 1. Pre-emergnet herbicide.
Boron [foliar].
fungicide active ingredient chlorothalonil (an every-other-week spray beginning about 30 days after planting)
Planting methods - By hand or planters (Earthways).
Data Collection & Sampling - Stand establishment and Harvest.
Project Maintenance - Weeding as needed.
Equipment needed - Moldboard plow, Harrow disk, others - TBD.
Field crew assistance - Yes. For irrigation and land preparation.
_
Land Request
Preferred block- Block 4
Section- Northeast.
Area/Acres requested- Total area: L 66' x W 56'. (0.1 ac).
Greenhouse - Yes.
To Do
Complete TREC Land Request
Complete TREC Greenhouse Request
Request faculty sponsor to complete UFarm request.
Land Preparation
Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Standard cultivation.
Unit size - L 25' x W 12'. (300 sqft).
Seed Spacing in the mound - 3 inches.
Between-mound Spacing - 3 feet.
Space between units - 6 feet.
Field Buffers - 10 feet.
Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Direct, by hand.
Transplants? - No.
Support Structure (Rebar, String, etc.) - No.
Plastic Mulch? - No.
Full image of field layout, design, and plot arrangement - Available on TEAMs.
Date to complete land preparation - 9/20.
To Do: Update [checklist]( update link)
Complete TREC field preparation request
Row Crop
Plastic Culture
Fruit Crop
[Once per week for the first 2-3 weeks to germinate and establish**].
Irrigation Amount (per application) - 1 inch.
To Do: Update [checklist](( update link)
Complete TREC fieldwork request for irrigation.
Fertilizer Application
Label Name - Top side liquid Boron.
Analysis rates (NPK, etc.) - 6-0-0
Application rate per acre - 3.5 pints/acre (2.8 ounces to 1 gallon of water).
Application method (banded on top of the bed, soil incorporation, etc.) - Foliar spray [ ~2 months post planting].
Application timing and frequency - at 35-40 DAP(days after planting) and at 50-55 DAP
Lab or field personnel - Da-Young, Daniel, Jose.
To Do: Update [checklist](( update link)
Fertilizer request form
Herbicide Application
Label Name - Dual Magnum.
Active ingredient(s) and concentration - S-metolachlor, benoxacor.
Resistance Management: Group 15 Herbicide.
Restricted Entry Interval (REI): 24 hours.
Application rate per acre - 1 pint.
Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) - post-planting sprayer.
Application timing and frequency - Once at post-planting.
Lab or field personnel - Da-Young, Daniel, Jose.
CDMS website - Pages 33-34.
https://www.cdms.net/ldat/ld0G6007.pdf
To Do: Update [checklist](( update link)
Worker Protection Standard Training
Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel.
Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information
Pesticide/Herbicide request form
Project Maintenance Events
Research treatment application - Observational.
Weeding - As needed.
Scouting - NA,
Sampling - NA.
Harvesting and Sampling -
Project removal -
To Do: Update [checklist](( update link)
Equipment Request
Complete TREC fieldwork request well ahead of maintenance events.
Data Collection & Sampling
Database - TEAMs, GitHub.
Data type -
Data storage -
Metadata -
Data collection
Protocols -
Timing -
Logistics
Sample processing and analysis
Protocols -
Timing -
Logistics -
_
Contingencies
What important decisions are next to be made or remain a challenge?
What could possibly go wrong?
Planting methods - By hand or planters (Earthways).
Data Collection & Sampling - Stand establishment and Harvest.
Project Maintenance - Weeding as needed.
Equipment needed - Moldboard plow, Harrow disk, others - TBD.
Field crew assistance - Yes. For irrigation and land preparation.
Land Request
Preferred block- Block 4
Section- Northeast.
Area/Acres requested- Total area: L 66' x W 56'. (0.1 ac).
Greenhouse - Yes.
To Do
Complete TREC Land Request
Complete TREC Greenhouse Request
Request faculty sponsor to complete UFarm request.
Land Preparation
Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Standard cultivation.
Unit size - L 25' x W 12'. (300 sqft).
Seed Spacing in the mound - 3 inches.
Between-mound Spacing - 3 feet.
Space between units - 6 feet.
Field Buffers - 10 feet.
Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Direct, by hand.
Transplants? - No.
Support Structure (Rebar, String, etc.) - No.
Plastic Mulch? - No.
Full image of field layout, design, and plot arrangement - Available on TEAMs.
Date to complete land preparation - 9/20.
To Do: Update [checklist]( update link)
Complete TREC field preparation request
Row Crop
Plastic Culture
Fruit Crop
[Once per week for the first 2-3 weeks to germinate and establish**].
Irrigation Amount (per application) - 1 inch.
To Do: Update [checklist](( update link)
Complete TREC fieldwork request for irrigation.
Fertilizer Application
Label Name - Top side liquid Boron.
Analysis rates (NPK, etc.) - 6-0-0
Application rate per acre - 3.5 pints/acre (2.8 ounces to 1 gallon of water).
Application method (banded on top of the bed, soil incorporation, etc.) - Foliar spray [ ~2 months post planting].
Application timing and frequency - at 35-40 DAP(days after planting) and at 50-55 DAP
Lab or field personnel - Da-Young, Daniel, Jose.
To Do: Update [checklist](( update link)
Fertilizer request form
Herbicide Application
Label Name - Dual Magnum.
Active ingredient(s) and concentration - S-metolachlor, benoxacor.
Resistance Management: Group 15 Herbicide.
Restricted Entry Interval (REI): 24 hours.
Application rate per acre - 1 pint.
Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) - post-planting sprayer.
Application timing and frequency - Once at post-planting.
Lab or field personnel - Da-Young, Daniel, Jose.
CDMS website - Pages 33-34.
https://www.cdms.net/ldat/ld0G6007.pdf
To Do: Update [checklist](( update link)
Worker Protection Standard Training
Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel.
Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information
Pesticide/Herbicide request form
Project Maintenance Events
Research treatment application - Observational.
Weeding - As needed.
Scouting - NA,
Sampling - NA.
Harvesting and Sampling -
Project removal -
To Do: Update [checklist](( update link)
Equipment Request
Complete TREC fieldwork request well ahead of maintenance events.
Data Collection & Sampling
Database - TEAMs, GitHub.
Data type -
Data storage -
Metadata -
Data collection
Protocols -
Timing -
Logistics
Sample processing and analysis
Protocols -
Timing -
Logistics -
_
Contingencies
_
What important decisions are next to be made or remain a challenge?
What could possibly go wrong?
Project Information Overview
To Do: Review [checklist]( update link)
Project Objectives - A case study for peanut (Arachis hypogaea). Project Description -1 variety x 12 planting dates. (12 plots). Field size: L 66' x W 56'. (0.1 ac). Plot size: L 12' x W 25'. (300 sqft). Field Design - RCB with 4 reps. Blocked by replication. Field Diagrams - Maps can be found on TEAMS. Projected Start Date- September Projected End Date- ongoing. Project Manager(s)- Da-Young, Daniel Projected Planting Date- September 21st, 2022. Crop(s)- Peanut (Arachis hypogaea). Irrigation - Layflat to Drip tape. Applications - 1. Pre-emergnet herbicide.
Land Request
Preferred block- Block 4 Section- Northeast. Area/Acres requested- Total area: L 66' x W 56'. (0.1 ac). Greenhouse - Yes. To Do Complete TREC Land Request Complete TREC Greenhouse Request Request faculty sponsor to complete UFarm request.
Land Preparation
Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Standard cultivation. Unit size - L 25' x W 12'. (300 sqft). Seed Spacing in the mound - 3 inches. Between-mound Spacing - 3 feet. Space between units - 6 feet. Field Buffers - 10 feet. Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Direct, by hand. Transplants? - No. Support Structure (Rebar, String, etc.) - No. Plastic Mulch? - No. Full image of field layout, design, and plot arrangement - Available on TEAMs. Date to complete land preparation - 9/20. To Do: Update [checklist]( update link) Complete TREC field preparation request Row Crop Plastic Culture Fruit Crop
Irrigation
Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) - Yes. Solid set? (overhead irrigation, micro-sprinkler) - No. Irrigation Timing (frequency and trigger) - As needed*
Fertilizer Application
Label Name - Top side liquid Boron. Analysis rates (NPK, etc.) - 6-0-0 Application rate per acre - 3.5 pints/acre (2.8 ounces to 1 gallon of water). Application method (banded on top of the bed, soil incorporation, etc.) - Foliar spray [ ~2 months post planting]. Application timing and frequency - at 35-40 DAP(days after planting) and at 50-55 DAP Lab or field personnel - Da-Young, Daniel, Jose. To Do: Update [checklist](( update link) Fertilizer request form
Herbicide Application
Label Name - Dual Magnum. Active ingredient(s) and concentration - S-metolachlor, benoxacor. Resistance Management: Group 15 Herbicide. Restricted Entry Interval (REI): 24 hours. Application rate per acre - 1 pint. Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) - post-planting sprayer. Application timing and frequency - Once at post-planting. Lab or field personnel - Da-Young, Daniel, Jose. CDMS website - Pages 33-34. https://www.cdms.net/ldat/ld0G6007.pdf To Do: Update [checklist](( update link) Worker Protection Standard Training Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel. Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information Pesticide/Herbicide request form
Project Maintenance Events
Research treatment application - Observational. Weeding - As needed. Scouting - NA, Sampling - NA. Harvesting and Sampling - Project removal - To Do: Update [checklist](( update link) Equipment Request Complete TREC fieldwork request well ahead of maintenance events.
Data Collection & Sampling
Database - TEAMs, GitHub. Data type - Data storage - Metadata - Data collection Protocols - Timing - Logistics Sample processing and analysis Protocols - Timing - Logistics - _
Contingencies
What important decisions are next to be made or remain a challenge? What could possibly go wrong? Planting methods - By hand or planters (Earthways). Data Collection & Sampling - Stand establishment and Harvest. Project Maintenance - Weeding as needed. Equipment needed - Moldboard plow, Harrow disk, others - TBD. Field crew assistance - Yes. For irrigation and land preparation.
Land Request
Preferred block- Block 4 Section- Northeast. Area/Acres requested- Total area: L 66' x W 56'. (0.1 ac). Greenhouse - Yes. To Do Complete TREC Land Request Complete TREC Greenhouse Request Request faculty sponsor to complete UFarm request.
Land Preparation
Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Standard cultivation. Unit size - L 25' x W 12'. (300 sqft). Seed Spacing in the mound - 3 inches. Between-mound Spacing - 3 feet. Space between units - 6 feet. Field Buffers - 10 feet. Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Direct, by hand. Transplants? - No. Support Structure (Rebar, String, etc.) - No. Plastic Mulch? - No. Full image of field layout, design, and plot arrangement - Available on TEAMs. Date to complete land preparation - 9/20. To Do: Update [checklist]( update link) Complete TREC field preparation request Row Crop Plastic Culture Fruit Crop
Irrigation
Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) - Yes. Solid set? (overhead irrigation, micro-sprinkler) - No. Irrigation Timing (frequency and trigger) - As needed*
Fertilizer Application
Label Name - Top side liquid Boron. Analysis rates (NPK, etc.) - 6-0-0 Application rate per acre - 3.5 pints/acre (2.8 ounces to 1 gallon of water). Application method (banded on top of the bed, soil incorporation, etc.) - Foliar spray [ ~2 months post planting]. Application timing and frequency - at 35-40 DAP(days after planting) and at 50-55 DAP Lab or field personnel - Da-Young, Daniel, Jose. To Do: Update [checklist](( update link) Fertilizer request form
Herbicide Application
Label Name - Dual Magnum. Active ingredient(s) and concentration - S-metolachlor, benoxacor. Resistance Management: Group 15 Herbicide. Restricted Entry Interval (REI): 24 hours. Application rate per acre - 1 pint. Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) - post-planting sprayer. Application timing and frequency - Once at post-planting. Lab or field personnel - Da-Young, Daniel, Jose. CDMS website - Pages 33-34. https://www.cdms.net/ldat/ld0G6007.pdf To Do: Update [checklist](( update link) Worker Protection Standard Training Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel. Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information Pesticide/Herbicide request form
Project Maintenance Events
Research treatment application - Observational. Weeding - As needed. Scouting - NA, Sampling - NA. Harvesting and Sampling - Project removal - To Do: Update [checklist](( update link) Equipment Request Complete TREC fieldwork request well ahead of maintenance events.
Data Collection & Sampling
Database - TEAMs, GitHub. Data type - Data storage - Metadata - Data collection Protocols - Timing - Logistics Sample processing and analysis Protocols - Timing - Logistics - _
Contingencies
_ What important decisions are next to be made or remain a challenge? What could possibly go wrong?