[ ] Request faculty sponsor to complete UFarm request.
Land Preparation
Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Moldboard plow, disc and level the field, form mounds.
Row Length - 25 ft.
In-Row Spacing - 4-6 inches.
Between-Row Spacing - 3'
Field Buffers - 60 ft.
Plot size - 12 ft wide (4 rows) x 25 ft long (300 ft2) x 18 trts x 4 reps = 216 ft wide x 130 ft long.
Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Direct seeding.
Transplants? - No.
Support Structure (Rebar, String, etc.) - NA.
Plastic Mulch? - NA.
Full image of field layout, design, and plot arrangement - Maps, layout and desins can be found on TEAMS.
Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel.
Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information
Project Objectives - To determine hemp (Cannabis sativa) response to applied nitrogen.
Project Description - Grain & Fiber N study
Project Protocol - 3 varieties x 6 rates x 4 reps. (18 trt).
Field Design - RCB with 4 reps. Blocked by replication.
Field size: L 242' x W 160’. (0.89 ac).
Plot size: L 25' x W 12'. (300 sqft).
Field Diagrams - Maps can be found on TEAMS.
Treatments - eighteen (18) experimental units.
Projected Start Date- Mid-April, Early-May.
Projected End Date- September/October.
Project Manager(s)- Daniel, Ajit.
Projected Planting Date- 5/6 or 5/11.
Crop(s)- Hemp: Grain and Fiber. cv. Grain/fiber (Carmagnola, Abound, & SS-Beta).
Irrigation - Solid set: over-head sprinklers.
Applications - Six (6) Nitrogen treatments, split between **four (4) applications.
Planting methods - 3' Mounds, planted in center 1.25'. Seeded by hand.
Data Collection & Sampling - Emergence, Stand count, Height, Flowering, Sex ratio, Seed hardening. TBD.
Project Maintenance - Weeding/cultivation between rows.
Equipment needed - Moldboard plow, Harrow disk, Row marker, others - TBD.
Field crew assistance - Yes. For irrigation and land preparation.
Land Request
Preferred block- Block 1.
Section- NW.
Area/Acres requested- Field size: L 260' x W 110'. (0.66 ac).
Greenhouse - N/A.
To Do: Update check list
[ ] Complete TREC Land Request
[ ] Complete TREC Greenhouse Request
[ ] Request faculty sponsor to complete UFarm request.
Land Preparation
Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Moldboard plow, disc and level the field, form mounds.
Row Length - 25 ft.
In-Row Spacing - 4-6 inches.
Between-Row Spacing - 3'
Field Buffers - 60 ft.
Plot size - 12 ft wide (4 rows) x 25 ft long (300 ft2) x 18 trts x 4 reps = 216 ft wide x 130 ft long.
Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Direct seeding.
Transplants? - No.
Support Structure (Rebar, String, etc.) - NA.
Plastic Mulch? - NA.
Full image of field layout, design, and plot arrangement - Maps, layout and desins can be found on TEAMS.
Date to complete land preparation - 4/30-5/3.
To Do: Update check list
[ ] Complete TREC field preparation request
[ ] Row Crop
[ ] Plastic Culture
[ ] Fruit Crop
Irrigation
Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) - NA.
Solid set? (overhead irrigation, microsprinkler) - Solid set, overhead.
Irrigation Timing (frequency and trigger) - As needed [Once per week for first 2-3 weeks to germinate and establish].
Irrigation Amount (per application) - 1 inch/ TBD.
To Do: Update check list
Fertilizer Application
Label Name - Urea (N), Triple Super Phosphate (P), Sulfate of Potash (K)
Analysis rates (NPK, etc.) - 46-0-0 (N), 0-46-0 (P), 0-0-50 (K)
Application rate per acre - Urea
TSP
SOP
Application method (banded on top of the bed, soil incorporation, etc.) - Pre-plant incorporated, banded on top of the mound - except nitrogen.
Application timing and frequency - TBD.
Lab or field personnel - Daniel and Ajit.
To Do: Update check list
Herbicide Application
Label Name - Dual Magnum.
Active ingredient(s) and concentration - S-metolachlor, benoxacor.
Resistance Management: Group 15 Herbicide.
Restricted Entry Interval (REI): 12 hours.
Application rate per acre - 1 pint.
Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) - Post-planting, sprayer.
Application timing, frequency, and location - Once at post-planting. Applied across the entire plot (mounds and furrows).
Lab or field personnel - Daniel, Ajit, Jacob.
To Do: Update check list
Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel. Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information
Project Maintenance Events
Research treatment application -
Weeding - TBD PRE: Dual Magnum.** POST: cultivation or hooded applications.
Scouting - Weekly.
Sampling -
Harvesting and Sampling -
Project removal-
To Do: Update check list
[ ] Equipment Request
[ ] Complete TREC fieldwork request well ahead of maintenance events.
Data Collection & Sampling
Data type -
Data storage -
Metadata -
Data collection -
-Protocols -
Timing -
Logistics -
Sample processing and analysis -
Contingencies
What important decisions are next to be made or remain a challenge?
What could possibly go wrong?