Project Information Overview
Project Objectives -
Project Description -
Project Protocol -
Field Design -
Field Diagrams -
Projected Start Date-
Projected End Date-
Project Manager(s)-
Projected Planting Date-
Crop(s)-
Irrigation -
Applications -
Planting methods -
Data Collection & Sampling -
Project Maintenance -
Equipment needed -
Field crew assistance -
Land Request
Preferred block-
Section-
Area/Acres requested-
Greenhouse -
To Do
Complete TREC Land Request
Complete TREC Greenhouse Request
Request faculty sponsor to complete UFarm request.
Land Preparation
Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) -
Row Length -
In-Row Spacing
Between-Row Spacing -
Field Buffers -
Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) -
Transplants? -
Support Structure (Rebar, String, etc.) -
Plastic Mulch? -
Full image of field layout, design, and plot arrangement -
Date to complete land preparation -
To Do
Complete TREC field preparation request
Row Crop
Plastic Culture
Fruit Crop
Irrigation
Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) -
Solid set? (overhead irrigation, microsprinkler) -
Irrigation Timing (frequency and trigger) -
Irrigation Amount (per application) -
To Do
Complete TREC field work request for irrigation.
Fertilizer Application
Label Name -
Analysis rates (NPK, etc.) -
Application rate per acre -
Application method (banded on top of the bed, soil incorporation, etc.) -
Application timing and frequency -
Lab or field personnel
To Do
Fertilizer request form
Pesticide Application
Label Name -
Active ingredient(s) and concentration -
Application rate per acre -
Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) -
Application timing and frequency -
Lab or field personnel
To Do
Worker Protection Standard Training
Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel.
Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information
Pesticide request form
Project Maintenance Events
Research treatment application -
Weeding -
Scouting -
Sampling -
Harvesting and Sampling -
Project removal-
To Do
Equipment Request
Complete TREC field work request well ahead of maintenance events.
Data Collection & Sampling
Database
Data type -
Data storage -
Metadata -
Data collection
Protocols -
Timing -
Logistics
Sample processing and analysis
Protocols -
Timing -
Logistics -
Contingencies
_
What important decisions are next to be made or remain a challenge?
What could possibly go wrong?
Project Information Overview Project Objectives - Project Description - Project Protocol - Field Design - Field Diagrams - Projected Start Date- Projected End Date- Project Manager(s)- Projected Planting Date- Crop(s)- Irrigation - Applications - Planting methods - Data Collection & Sampling - Project Maintenance - Equipment needed - Field crew assistance - Land Request Preferred block- Section- Area/Acres requested- Greenhouse - To Do Complete TREC Land Request Complete TREC Greenhouse Request Request faculty sponsor to complete UFarm request. Land Preparation Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Row Length - In-Row Spacing Between-Row Spacing - Field Buffers - Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Transplants? - Support Structure (Rebar, String, etc.) - Plastic Mulch? - Full image of field layout, design, and plot arrangement - Date to complete land preparation - To Do Complete TREC field preparation request Row Crop Plastic Culture Fruit Crop Irrigation Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) - Solid set? (overhead irrigation, microsprinkler) - Irrigation Timing (frequency and trigger) - Irrigation Amount (per application) - To Do Complete TREC field work request for irrigation. Fertilizer Application Label Name - Analysis rates (NPK, etc.) - Application rate per acre - Application method (banded on top of the bed, soil incorporation, etc.) - Application timing and frequency - Lab or field personnel To Do Fertilizer request form Pesticide Application Label Name - Active ingredient(s) and concentration - Application rate per acre - Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) - Application timing and frequency - Lab or field personnel To Do Worker Protection Standard Training Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel. Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information Pesticide request form Project Maintenance Events Research treatment application - Weeding - Scouting - Sampling - Harvesting and Sampling - Project removal- To Do Equipment Request Complete TREC field work request well ahead of maintenance events. Data Collection & Sampling Database Data type - Data storage - Metadata - Data collection Protocols - Timing - Logistics Sample processing and analysis Protocols - Timing - Logistics - Contingencies _ What important decisions are next to be made or remain a challenge? What could possibly go wrong?