Closed whirm closed 11 years ago
Power strip ordered
I'm getting the ticket again as the power strip is been ordered.
The power strip has been installed and we have a script in node300 that allows us to power-cycle all the nat boxes.
We need to decide when to do it.
When do the tasks run that use the NAT boxes? Would x minutes before those tasks start be doable in Jenkins?
the thing is that more people is using the cluster, so maybe its better to just do it once during the weekend?
I don't know how long it takes before the boxes need a hard reset, if it takes longer than a week, then at the start of the weekend makes sense. I see no problem as long as everyone using the cluster knows about it.
I can't advance on this one until we know what happens with the whole DAS2 thing.
Forgot to close this one. Now the NAT boxes get power cycled before the nightly run.
We should get a usb/serial controlled power strip to be able to automate power cycling all the NAT boxes before or after a NAT experiment run.
Something similar to this would be good enough: http://www.amazon.com/PwrUSB-Basic-controlled-Automation-automatically-remotely/dp/B008AZW9P6