As a finance guy I want planned to changed to planned $ and Utilization to utilization%.
Accumulative to Year to date
Acceptance criteria:
Given: I am logged in into the system
When: I go to the dashboard
Then: A percentage sign is displayed with utilization and a dollar sign with planned.
As a finance guy I want planned to changed to planned $ and Utilization to utilization%.
Accumulative to Year to date Acceptance criteria: Given: I am logged in into the system When: I go to the dashboard Then: A percentage sign is displayed with utilization and a dollar sign with planned.