Closed kerrielake closed 1 year ago
Updated Terminal floor:
-Added construction flooring edges -Fixed graphical issue with one window -Removed a column in left side wall -Added floor number above elevator -Fixed layering of wall in entrance to construction area
Updated Terminal floor:
-Added construction flooring edges -Fixed graphical issue with one window -Removed a column in left side wall -Added floor number above elevator -Fixed layering of wall in entrance to construction area