Open achafetz opened 6 years ago
Reopening with the question from Mavis;
With regards to the targets, will you be calculating a standard weekly target (e.g. annual target/52)? I was thinking that a calculation that includes the roll-over of unmet targets from prior weeks. Is the automation of such a calculation doable?
Currently, we calculate the weekly target as annual target divided 52 weeks.
If we moved to rolling, how would we handle "negative" targets (in visuals) where partner exceeded calculated weekly target? What if weeks are skipped during reporting?
Maybe add additional visual on cumulative to track?
Current Target process:
wpm_pulltargets()
wpm_combine()
script, targets are incorporated via wpm_addtargets()
by joining (left_join()
) the above output (weekly targets) onto the weekly results.This can be an issue because there may be missing weeks of reporting, which would then be missing the targets to join onto.
An alternative:
TX_CURR
, snapshot indicator)full_join()
with the results datasetSince weekly targets are kind of meaningless, it may be best to use the cumulative results/targets graph (upper right above) to track progress
Targets need to be