United-Home / 125-Frederick

MIT License
1 stars 0 forks source link

Main House Sub-Panel Box #15

Open SuzyQuant opened 7 months ago

SuzyQuant commented 7 months ago

Background

The 125 Frederick property currently operates on a 100 Amp electrical service which encompasses the main house, shed, sunroom, dance studio, and guest house. In an effort to enhance the electrical infrastructure and ensure adequate power distribution, an upgrade to a 400 Amp service is proposed. Post-upgrade, the main house will be allocated 100 Amps exclusively. The existing sub-panel box will remain intact; however, the electrical circuits extending to the shed, sunroom, and guest house will be decommissioned and rerouted as necessary.

Tasks

Acceptance Criteria

Story Points

This task is estimated at 8 story points, reflecting the complexity and the coordination required with various stakeholders, including electricians, local authorities, and inspectors.

Labels

Image Links

This is the panel box of the main house. It is 100 Amps and will be connected to one of the 4-gangs of a 400 Amp Electrical Box.

https://github.com/United-Home/125-Frederick/blob/main/Media/images/December_2023/IMG_0807.jpeg