The sunroom at the 125 Frederick property is undergoing a transformation into a self-sufficient one-bedroom apartment. This conversion necessitates the establishment of a dedicated plumbing system to service the new kitchen and bathroom facilities. The system must be designed to ensure efficient water flow and waste disposal, adhering to the highest standards of sanitation and building codes.
Tasks
Plumbing System Design
Create a comprehensive plumbing layout that accommodates the kitchen and bathroom.
Design the system to optimize water pressure and drainage.
Material Procurement
Acquire all necessary pipes, fittings, fixtures, and other plumbing materials.
Installation
Install plumbing lines in accordance with the approved design.
Ensure all fixtures are properly connected and tested for leaks.
Insulation and Protection
Insulate pipes to prevent freezing and maintain energy efficiency.
Install protective measures to safeguard against potential water damage.
Compliance and Testing
Conduct thorough testing of the entire plumbing system for leaks and proper function.
Ensure the system complies with all relevant building codes and standards.
Acceptance Criteria
The plumbing system must provide an uninterrupted supply of water and facilitate efficient waste disposal.
All installations must be leak-proof and demonstrate robustness during pressure testing.
The system should comply with local building codes, with documentation to verify adherence.
Final inspection must confirm that the plumbing system is operational, safe, and ready for use.
Story Points
The complexity of designing and installing a new plumbing system within the existing structure is reflected in the assignment of 2 story points to this section. This estimation accounts for the technical expertise required and the meticulous attention to detail necessary for successful completion.
This markdown documentation will be integrated into the project's GitHub repository, serving as an essential reference for the team members executing the plumbing and sanitation phase of the sunroom conversion.
Background
The sunroom at the 125 Frederick property is undergoing a transformation into a self-sufficient one-bedroom apartment. This conversion necessitates the establishment of a dedicated plumbing system to service the new kitchen and bathroom facilities. The system must be designed to ensure efficient water flow and waste disposal, adhering to the highest standards of sanitation and building codes.
Tasks
Plumbing System Design
Material Procurement
Installation
Insulation and Protection
Compliance and Testing
Acceptance Criteria
Story Points
The complexity of designing and installing a new plumbing system within the existing structure is reflected in the assignment of 2 story points to this section. This estimation accounts for the technical expertise required and the meticulous attention to detail necessary for successful completion.
This markdown documentation will be integrated into the project's GitHub repository, serving as an essential reference for the team members executing the plumbing and sanitation phase of the sunroom conversion.
Image Links
https://github.com/United-Home/125-Frederick/blob/main/Media/images/December_2023/IMG_0832.jpeg
https://github.com/United-Home/125-Frederick/blob/main/Media/images/December_2023/IMG_0833.jpeg
https://github.com/United-Home/125-Frederick/blob/main/Media/images/December_2023/IMG_0836.jpeg