Guest House Sub-Panel Box #18

Open SuzyQuant opened 10 months ago

SuzyQuant commented 10 months ago

Background

The Guest House at the 125 Frederick property currently receives electrical power through a shared service panel that is rated at 100 amps. In order to accommodate the increased energy demands and enhance the reliability of the electrical supply, an upgrade to a dedicated 100 amps sub-panel sourced from the newly proposed 400 amps 4 gangs service panel is necessitated. This sub-panel will ensure that the Guest House has an independent and stable power supply, mitigating any potential overload issues and aligning with modern electrical standards.

Tasks

  1. Design and Documentation
    • Create a detailed design for the Guest House sub-panel integration within the 400 amps service panel infrastructure.
    • Document the specifications and requirements for the dedicated 100 amps sub-panel.
  2. Procurement of Materials
    • Acquire a 100 amps sub-panel with appropriate circuit breakers and safety devices.
    • Obtain all necessary wiring and ancillary components for the installation.
  3. Installation
    • Install the 100 amps sub-panel in the Guest House, ensuring it occupies one gang within the 400 amps service panel.
    • Execute all necessary wiring and connections between the main service panel and the Guest House sub-panel.
  4. Testing and Validation
    • Conduct thorough testing to verify the operational integrity of the sub-panel.
    • Validate that the power supply to the Guest House is consistent and meets the required specifications.
  5. Documentation and Reporting
    • Compile a detailed report of the installation process, including diagrams and specifications.
    • Update the property's electrical system blueprints to reflect the new sub-panel installation.

Acceptance Criteria