United-Home / 2405-45th-St

MIT License
0 stars 0 forks source link

Apt B Electrical Socket Upgrade #13

Closed SuzyQuant closed 1 month ago

SuzyQuant commented 1 month ago

In circuit (CKT) 18, work on the electrical outlets by upgrading to 20A. The first image shows the Electrical Schedule of 2405 45th.

The needed upgrades include areas in Apt B:

Electric Schedule as of October 29, 2024:

Electric Schedule October 2024

Label per Room:

image

Electric Panel Location (Inside the House)

Electrical Panel Location

Apt A

image

Apt B

image