This task involves the complete relocation of the electrical panel box from its current indoor location to a designated outdoor location based on the plan achieved from the Issue https://github.com/United-Home/2405-45th-St/issues/16, ensuring compliance with safety standards and local regulations.
Sub-tasks:
Disconnect Power: Safely disconnect power to the existing electrical panel to prevent any electrical hazards during the relocation process.
Remove Existing Panel: Carefully remove the existing electrical panel box from its current location, ensuring that all connections are properly detached.
Install New Panel: Install the new electrical panel box at the designated outdoor location, ensuring secure mounting and accessibility.
Connect Circuits: Reconnect all circuits to the new panel according to the previously developed circuit distribution plan from Issue https://github.com/United-Home/2405-45th-St/issues/15, ensuring proper organization and functionality.
Test Functionality: Conduct thorough testing of the new panel to ensure all connections are operational and meet safety standards.
Acceptance Criteria:
The new electrical panel is securely mounted in the designated outdoor location.
All circuits are properly connected and organized as per the circuit distribution plan.
The panel functions correctly, with all circuits operational and no safety issues identified.
Compliance with local electrical codes and safety regulations is verified.
Objective:
This task involves the complete relocation of the electrical panel box from its current indoor location to a designated outdoor location based on the plan achieved from the Issue https://github.com/United-Home/2405-45th-St/issues/16, ensuring compliance with safety standards and local regulations.
Sub-tasks:
Acceptance Criteria: