The porch of the property at 313 Walnut is undergoing a significant transformation. As part of this project, a professional painting task is required. This task is pivotal to the overall aesthetic and value enhancement of the property. It involves the application of primer and paint to all areas of the porch, ensuring a uniform, professional, and revitalized appearance.
Detailed Tasks
[ ] 1: Application of Primer (Estimated Time: 1-2 days)
Apply a primer to all surfaces of the porch to ensure the paint adheres properly and provides a uniform finish.
[ ] 2: Painting of Porch (Estimated Time: 2-3 days)
Paint all areas of the porch, including the skirt, ceiling, columns, flooring, and the enclosed section with French windows, ensuring a professional and consistent finish.
[ ] 3: Application of Second Coat (Estimated Time: 2-3 days)
Apply a second coat of paint if necessary, ensuring all surfaces are fully covered and present a revitalized appearance.
Acceptance Criteria
All tasks are completed within the estimated timeframes.
A primer is applied to all surfaces of the porch.
All areas of the porch are painted, providing a professional and consistent finish.
A second coat of paint is applied if necessary, ensuring all surfaces are fully covered and present a revitalized appearance.
Story Points
This task is estimated to be 8 story points, considering the complexity, effort, and uncertainty involved.
Total Estimated Time
The total estimated time for this task is 5-7 days, including the application of primer, painting, and the potential application of a second coat.
Background The porch of the property at 313 Walnut is undergoing a significant transformation. As part of this project, a professional painting task is required. This task is pivotal to the overall aesthetic and value enhancement of the property. It involves the application of primer and paint to all areas of the porch, ensuring a uniform, professional, and revitalized appearance.
Detailed Tasks
[ ] 1: Application of Primer (Estimated Time: 1-2 days)
Apply a primer to all surfaces of the porch to ensure the paint adheres properly and provides a uniform finish.
[ ] 2: Painting of Porch (Estimated Time: 2-3 days)
Paint all areas of the porch, including the skirt, ceiling, columns, flooring, and the enclosed section with French windows, ensuring a professional and consistent finish.
[ ] 3: Application of Second Coat (Estimated Time: 2-3 days)
Apply a second coat of paint if necessary, ensuring all surfaces are fully covered and present a revitalized appearance.
Acceptance Criteria
Story Points This task is estimated to be 8 story points, considering the complexity, effort, and uncertainty involved.