Closed mrvanes closed 3 years ago
On page 19, the bed carrier is fastened using two M3x8 BHCS bolts at the bottom, but there is no instruction to preload M3's.
Correct. Because both the nuts and bolts are used that step we don't show the preload icon because it isn't a preload.
Page 18
On page 19, the bed carrier is fastened using two M3x8 BHCS bolts at the bottom, but there is no instruction to preload M3's.