Open RHammond2 opened 2 years ago
A model to post-hoc apply aggregate model losses (wake, electrical, etc.) would be ideal to better translate between the power production model and what is typically seen in operational analyses.
A model to post-hoc apply aggregate model losses (wake, electrical, etc.) would be ideal to better translate between the power production model and what is typically seen in operational analyses.