Open linperez opened 2 years ago
Discussion from today's PA2 meeting:
Use BMP api to compute “load increase if developed” which would be propagated down
- The delta of this and the existing load would be loads avoided
- “load increase if developed” = future load - current load
- Perform this step using both the OSI predictions and Clare’s prediction
- Use whichever is greater
Related to #4
Drexel team to decide best and most efficient workflow to automate protected land future avoided pollutant loads
Resolve if BMP API "land use change" archetype could be modified
OR
if LPIA modeling code can be used to calculate lbs avoided from outputs from /api/fzs_buildout/ parcel results