For PRs

Background

PR2

PR3

PRM

:bulb: Todo

Item PRM PR2 PR3 reference
Open hatch Feb. 28th done --- Feb. 28th done
visual inspection: mechanically touching? Yes, at TM-stage --- yes, at BF-GAS. and released.
IM-OSEM position tuning --- (*1)
get the position when the large offset was applied, from IOO member --- ---
visual inspection: mechanically touching? iteration-2 (*2) --- (*1)
release bread board ---
replace the LVDT board and copy the tuned parameters --- ---
Measure all the sensor spectra and check if they are reasonable, no-friction, no-touching etc. mode list
Measure all the measurable transfer functions and compare them with simulation p.108-111 in ref1
check: FR range with GAS-LVDT BF: from to / SF: from to BF: from to / SF: from to BF: from to / SF: from to

(1) This necessity is to be determined by measured transfer functions. (2) check the both cases

In addition,

PR2

YoshinoriFujii commented 5 years ago

PR3 replace the HPCD and the satellite box

It seemed that this was caused by a shorted circuit of HPCD. see klog#8290

YoshinoriFujii commented 5 years ago

PR2 check BF-LVDT-V2 condition?

It was found that the channel of the LVDT board seemed dead. see klog#8253