This is a copy to be studied and updated, from project created by Andry Virvich (https://code.google.com/u/andry.virvich/) on https://code.google.com/p/jira-chrome-extension/.
0
stars
0
forks
source link
Work log time should correspond to the start of the work that was done. #32
This is an enhancement proposal, not an actual problem or defect.
It should be possible to configure the plugin to have the following behaviour...
When I register a work log on a certain issue, the corresponding work log
time/date is the current time. It should be possible to activate an option in
the configuration to subtract the work log length from the work log time/date.
Example:
At 10:15, I create a work log for 30 minutes. In Jira, the work log has the
time/date of 10:15.
With this option enabled, the work log would be registered in Jira at 09:45,
with the 30 minute length.
This is very useful when a precise time registration is important. We use Jira
in our organization for service desk issue management and we use issue work
logs to track at which time a certain task was initiated.
Thanks for a great plugin. :)
Original issue reported on code.google.com by jsribe...@gmail.com on 21 Dec 2011 at 7:29
Original issue reported on code.google.com by
jsribe...@gmail.com
on 21 Dec 2011 at 7:29