[!NOTE]
:es: A partir de ahora, el repositorio está en proceso de migrar por completo a inglés.
Plans for the R6 rewrite
(hopefully) The last time I'll need to deeply restructure my project before a release.
Hi there!
I'll go straight to the point, this is the list of goals I want to achieve before considering R6 production (almost)[^1] ready, so we can finally merge this with main and get another PRE-APP release.
[ ] Getting the basic features from R5 to work (creating active objectives, removing them, etc...).
Actually, just that would be enough to merge. But here are some extra goals I will try to achieve:
[X] Make the on-boarding experience better.
[X] Make the daily log functional, at least show a simple calendar on your home page. Done (table on the homepage. It will be done better in the future).
[ ] Fix all known errors. See #3 (NOT ENGLISH YET).
[ ] Improve the UI to be better and actually follow my original design.
[ ] Add icons to objectives at the dashboard.
[X] Ensure consistent sizing, measurement, and so on. Done.
[ ] Reorganize the Profile page and create a settings page to separate stuff.
[ ] Other changes...
[ ] Add the ability to edit an active objective.
[X] Add the ability to view some pieces of data (e.g. BFP or BMI) and what they should mean to the user, via CoreLibrary (formerly "OpenHealth"). Done (Report page).
[ ] Add a light theme (yes).
I will achieve them anyways, either before or after the R6 "completion", but I'll try to make the merged result as cool as possible. If I see it's taking too long to do all of this I'll just merge and keep going from the main branch and with the typical 1-2 week PRE-APP release cycle.
Until then, see ya!
[^1]: There are a few tweaks I'll make after merging and before releasing a new PRE-APP APK, and I am also hoping for a PR from a friend, so we'll have to merge before.
Plans for the R6 rewrite
(hopefully) The last time I'll need to deeply restructure my project before a release.
Hi there!
I'll go straight to the point, this is the list of goals I want to achieve before considering R6 production (almost)[^1] ready, so we can finally merge this with
main
and get another PRE-APP release.Actually, just that would be enough to merge. But here are some extra goals I will try to achieve:
I will achieve them anyways, either before or after the R6 "completion", but I'll try to make the merged result as cool as possible. If I see it's taking too long to do all of this I'll just merge and keep going from the
main
branch and with the typical 1-2 week PRE-APP release cycle.Until then, see ya!
[^1]: There are a few tweaks I'll make after merging and before releasing a new PRE-APP APK, and I am also hoping for a PR from a friend, so we'll have to merge before.