Closed adamgreenhall closed 11 years ago
Either through a fuel cost schedule or as part of the bid points file, as in:
Date, Power, Cost 1/2/2012,0,0 1/2/2012,100,1000 1/2/2012,150,1550 1/3/2012,0,0 1/3/2012,100,1100 1/3/2012,150,2000 1/4/2012,0,0 1/4/2012,100,1100 1/4/2012,150,2000
Either through a fuel cost schedule or as part of the bid points file, as in: