aelve / guide

A workspace for research teams
https://guide.aelve.com
106 stars 10 forks source link

Fix some bugs in the Travis config and reduce the number of jobs #290

Closed neongreen closed 5 years ago

neongreen commented 5 years ago

This PR brings CI time from 40 minutes to 30 minutes.

The absolute possible minimum is something like 10–15 minutes, I think, but it would require moving from Travis to Gitlab (Travis caching is slow).