ajency / cashflow-issue-tracker

Issue Tracker for issues
0 stars 1 forks source link

TASK - Variance Graphs new UI #710

Closed nutank closed 4 years ago

nutank commented 4 years ago

image (7)

nutank commented 4 years ago

@Vaibhavarolkar would need to do the color changes for "Planned vs Actual" and "Planned vs Actual Accuracy" as follows:

image

robiulpro commented 4 years ago

Completed.

HazelColaco19 commented 4 years ago

The colors don't match the design @Vaibhavarolkar Please check

@robiulpro Can see this at first

image

Then i switch between drop downs and the graph breaks

image

robiulpro commented 4 years ago

@nutank @HazelColaco19 None of the color mismatch, the thing is in real scenario the difference of planned and real is huge, so it looks like the color is different.

robiulpro commented 4 years ago

Breaking graph on dropdown changes: Fixed.

HazelColaco19 commented 4 years ago

@robiulpro

  1. I added more data and tested the colors, I guess the one marked by me still appear different Orange and green both look brighter

image

  1. It doesn't break the graph anymore on drop down shift ---> Fixed
robiulpro commented 4 years ago

@Vaibhavarolkar Could you please give me the correct color code for left side graph as mentioned by @HazelColaco19

robiulpro commented 4 years ago

@HazelColaco19 Color corrected.

HazelColaco19 commented 4 years ago

Fixed.

image