PSE-1439 - This PR made sure the values were set in one place but the template calls the build script in two places so the second one also needs to be set
Checklist
[x] My PR title includes a relevant Jira ticket name
[ ] If I made configuration changes, they are in the config template in the deploy directory
[ ] I have added unit tests where appropriate
[ ] I have added integration tests where appropriate
[x] Manual tests are required in a cluster -> made this change manually on a cluster
Backporting
This will need to be merged into the following support branches:
PSE-1439 - This PR made sure the values were set in one place but the template calls the build script in two places so the second one also needs to be set
Checklist
Backporting
This will need to be merged into the following support branches: