angular-material-extensions / calendar

Angular responsive calendar built with material design for desktop and mobile
MIT License
21 stars 5 forks source link

An in-range update of rollup is breaking the build 🚨 #12

Open greenkeeper[bot] opened 5 years ago

greenkeeper[bot] commented 5 years ago

The devDependency rollup was updated from 0.67.3 to 0.67.4.

🚨 View failing branch.

This version is covered by your current version range and after updating it in your project the build failed.

rollup is a devDependency of this project. It might not break your production code or affect downstream projects, but probably breaks your build or test tools, which may prevent deploying or publishing.

Status Details - ❌ **continuous-integration/travis-ci/push:** The Travis CI build could not complete due to an error ([Details](https://travis-ci.org/angular-material-extensions/calendar/builds/462666617?utm_source=github_status&utm_medium=notification)).

FAQ and help There is a collection of [frequently asked questions](https://greenkeeper.io/faq.html). If those don’t help, you can always [ask the humans behind Greenkeeper](https://github.com/greenkeeperio/greenkeeper/issues/new).

Your Greenkeeper Bot :palm_tree:

greenkeeper[bot] commented 5 years ago

After pinning to 0.67.3 your tests are still failing. The reported issue might not affect your project. These imprecisions are caused by inconsistent test results.