angular-material-extensions / calendar

Angular responsive calendar built with material design for desktop and mobile
MIT License
21 stars 5 forks source link

An in-range update of gulp-git is breaking the build 🚨 #36

Open greenkeeper[bot] opened 5 years ago

greenkeeper[bot] commented 5 years ago

The devDependency gulp-git was updated from 2.8.1 to 2.9.0.

🚨 View failing branch.

This version is covered by your current version range and after updating it in your project the build failed.

gulp-git is a devDependency of this project. It might not break your production code or affect downstream projects, but probably breaks your build or test tools, which may prevent deploying or publishing.

Status Details - ❌ **continuous-integration/travis-ci/push:** The Travis CI build failed ([Details](https://travis-ci.org/angular-material-extensions/calendar/builds/489706581?utm_source=github_status&utm_medium=notification)).

Commits

The new version differs by 2 commits.

  • cb98cb8 2.9.0
  • c27a014 Ensure git.diff has maxBuffer opt - closes #192

See the full diff

FAQ and help There is a collection of [frequently asked questions](https://greenkeeper.io/faq.html). If those don’t help, you can always [ask the humans behind Greenkeeper](https://github.com/greenkeeperio/greenkeeper/issues/new).

Your Greenkeeper Bot :palm_tree:

greenkeeper[bot] commented 5 years ago

After pinning to 2.8.1 your tests are still failing. The reported issue might not affect your project. These imprecisions are caused by inconsistent test results.

greenkeeper[bot] commented 4 years ago

Your tests are still failing with this version. Compare changes

Commits

The new version differs by 3 commits.

See the full diff