Closed anuaimi closed 1 year ago
the code can only do the right pages of the planner. create to the code to be able to do a rough cut of the left page
header is calendar rather than month-year only 3 days not 4 (sat/sun split)
the code can only do the right pages of the planner. create to the code to be able to do a rough cut of the left page