Closed krrisis closed 5 years ago
Issue Status: 1. Open 2. Started 3. Submitted 4. Done
This issue now has a funding of 150.0 ANT (59.94 USD @ $0.4/ANT) attached to it as part of the Aragon DAC fund.
Issue Status: 1. Open 2. Started 3. Submitted 4. Done
Work has been started.
These users each claimed they can complete the work by 1 month ago. Please review their action plans below:
1) emmaodia has been approved to start work.
I have read through the Tips, the things to complete and the notes and I'm ready to begin work. I have a knowledge of the md syntax and have my local machine set up.
Learn more on the Gitcoin Issue Details page.
2) johnlenin00 has been approved to start work.
already finished the work - will be sending a PR
Learn more on the Gitcoin Issue Details page.
Issue Status: 1. Open 2. Started 3. Submitted 4. Done
Work for 150.0 ANT (66.47 USD @ $0.44/ANT) has been submitted by:
@krrisis please take a look at the submitted work:
⚡️ A tip worth 22.50000 ANT (9.97 USD @ $0.44/ANT) has been granted to @johnlenin00 for this issue from @krrisis. ⚡️
Nice work @johnlenin00! To redeem your tip, login to Gitcoin at https://gitcoin.co/explorer and select 'Claim Tip' from dropdown menu in the top right, or check your email for a link to the tip redemption page.
@krrisis thank you!
Issue Status: 1. Open 2. Started 3. Submitted 4. Done
The funding of 150.0 ANT (66.47 USD @ $0.44/ANT) attached to this issue has been approved & issued to @johnlenin00.
Additional Tips for this Bounty:
This issue is for a community contributor to compile the whole issue of the next Aragon Monthly Newsletter that encompasses the content from December 2018 in MarkDown files in the given format and structure.
The issue has to be closed in a single Pull Request that has all the necessary files and additions incorporated into them as defined below. Please read the updated content and tips below, even if you did this before (updated request!).
TIP:
if you get stuck, check the code of the most recent issue in the archive
if you have some minor questions tag @krrisis in your comment or ask them in our Monthly chatroom
Some more technical and other tips at the end of this issue to get you started.
More info on what the Aragon Monthly is all about right here
The current version of the Aragon Monthly (and previous issues) can be found on monthly.aragon.org.
Things to complete:
1) News
docs/news/index.md
has to have all of the Issues from https://github.com/aragon/aragon-monthly/issues titled Issue 10: add ... to NewsAll the items from
news/index.md
have to be also included in thenews/tag.md
respective files based on the tag given to them innews/index.md
. This means: Aragon related news have to be included innews/aragon.md
, same for other categories such as DAOs and Governance.All news items in
news/index.md
andtags.md
should be in chronological order based on their date of publishing indicated in the original news item from oldest to newestExamples of proper formatting and structure for news here, and here.
Featured news on top of the pages are optional, the Monthly staff can choose and add these as well Guide for news here
2) Articles
Any Articles submitted during the period for a given Issue of Monthly need to be added to
articles/index.md
under their respective Categories as well as to thearticles/category.md
files in a similar fashion as News items.Guide for articles here
TIP: If there are no articles, you can keep the links for people to submit articles (see guide)
3) Classifieds
Any Classifieds submitted during the period for a given Issue of Monthly need to be added to
classifieds/index.md
.Guide for classifieds here
TIP: If no classifieds are submitted, please check which classifieds of the previous edition are still valid and copy these. (if it is an event or a promotion, please also verify the dates)
4) Front Page
This page shows the most recent News items, Articles and Classifieds Order here should be from newest to oldest (!), with 3 items for News and Classifieds and max 2 for Articles.
**General editing tips:
Examples of what a proper, successful Pull Request for this issue would look like:
https://github.com/aragon/aragon-monthly/pull/138
https://github.com/aragon/aragon-monthly/pull/145
Notes
How do I run a local version of the site for editing?
pip install mkdocs-material
aragon-monthly
directory, runmkdocs serve
Revisions
We will allow for a maximum of 3 revisions to the Pull Request based on feedback given by the Monthly staff, if the PR still doesn't meet the quality and standard, we will close the PR.
This Issue should be finished and merged as soon as possible, this is first-come, first-served; the first proper Pull Request will be merged and will be awarded the associated bounty.
Bounty
This task and bounty will be recurring, it will be repeated every month, if we see a contributor repeatedly successfully accomplish the task, the person can be added to the Monthly editor staff and they will be able to assign themselves and will have the ability to claim the work and associated bounty in the future._