Open pnguyen-dh opened 4 months ago
Hi I try to change the type_hs and type_dhw to biomass boiler 10/50/100 kW, and then calculate the energy demand, but this error comes up:
Exception: check potential error in input database of LCA infrastructure / HEATING To Reproduce Steps to reproduce the behavior:
Exception: check potential error in input database of LCA infrastructure / HEATING
Hardware (please complete the following information):
I also found out this red errors, while looked in the database, I'm not sure, if it's relevant.
Best.
Hi @pnguyen-dh
Thanks for raising this issue. I was able to identify the problem. I will update you once I fix it.
Hi I try to change the type_hs and type_dhw to biomass boiler 10/50/100 kW, and then calculate the energy demand, but this error comes up:
Exception: check potential error in input database of LCA infrastructure / HEATING
To Reproduce Steps to reproduce the behavior:Hardware (please complete the following information):
I also found out this red errors, while looked in the database, I'm not sure, if it's relevant.
Best.