Closed shanshanhsieh closed 6 years ago
sure!
Implement the calculation procedure with a generic control strategy designed by SH&GH (see workflow). The script should calculate sensible & latent cooling loads from the 3for2 system. Need to add additional variables to tsd. (e.g. Qsen,radiator)
Currently, there are four emission system for cooling (none/ radiant panels/ centralized AC/ mini-split AC). But it is not possible to have a combination of these systems. A low-exergy emission system which consists radiant panels, dehumidification of indoor air, and ventilation should be implemented. Support from @gabriel-happle will be needed.