What steps will reproduce the problem?
1. Drop two actvities in a lane
2. Connect these activities via sequence flow
3. Define a fix point the flow has to cross
4. repostionate pool
What is the expected output? What do you see instead?
The Sequence Flow should be repositionate relativ to translation of pool,
incl. the fix point, but the point is absolute to diagramm.
Connection shapes seems not to be children of lane. For example see BPMN
model Fallstudie.
Original issue reported on code.google.com by ole.ecke...@gmail.com on 5 Dec 2007 at 10:55
Original issue reported on code.google.com by
ole.ecke...@gmail.com
on 5 Dec 2007 at 10:55