SURCHARGEPRELOADED | A method that applies load to the foundation to discharge pore water, and the foundation is consolidated to improve the foundation strength. Unloading when the carrying capacity reaches the required level.
VERTICALLYDRAINED | A method to set vertical drainage measures in the foundation, so that pore water in the soil is discharged and the foundation strength is improved.
To be checked by domain team.
Current modelling:
SURCHARGEPRELOADED | A method that applies load to the foundation to discharge pore water, and the foundation is consolidated to improve the foundation strength. Unloading when the carrying capacity reaches the required level. VERTICALLYDRAINED | A method to set vertical drainage measures in the foundation, so that pore water in the soil is discharged and the foundation strength is improved. To be checked by domain team.