Closed HannuLahtela closed 8 months ago
@HannuLahtela Please sync from main, there is a change necessary to activate the checker.
If you require assistance, please shoot me an email.
Done. Ps. In the next two weeks or so, I'll be busy with another IFC project. So, I won't join the online meetings then.
-Hannu-
Hatsinanpuisto 8A, 02600 Espoo Finland +358505701321 Mobile
@.*** www.trimble.com
On Sat, Sep 16, 2023 at 12:00 PM Stefan Jaud @.***> wrote:
@HannuLahtela https://github.com/HannuLahtela Please sync from main, there is a change necessary to activate the checker.
[image: grafik] https://user-images.githubusercontent.com/59165496/268439106-1e80c614-5780-4946-8393-0c87458b5ffb.png
If you require assistance, please shoot me an email.
— Reply to this email directly, view it on GitHub https://github.com/bSI-InfraRoom/IFC-Tunnel-Deployment/pull/180#issuecomment-1722182160, or unsubscribe https://github.com/notifications/unsubscribe-auth/AO2DM3FMEHL7T4LWMUGSDKDX2VTDBANCNFSM6AAAAAA4OVCEGY . You are receiving this because you were mentioned.Message ID: @.***>
Ping @pjanck. Can you check to see why the checker doesn't finish when you have some time?
Ping @HannuLahtela. When you are back, could you pls do the syncing. This should result in a commit in the history of this PR.
@HannuLahtela : Can you please do the syncing of main for this branch as well (same as you did for #102)?
@pjanck : Seems like logs have been deleted. Is it possible to re-run checks?
File
Provide a short summary (3-5 lines): For example, is it a new file, an update to an existing one? Provide some bullet points about the content of the file, e.g. terrain model, tunnel structure, etc.
Covered Concept Templates - Usages Included
Please list all Usages you have implemented.
Miscellaneous
Please use this area to convey anything else.