Open nyurik opened 2 years ago
BT and SBF blocks are not compatible because the signalling, as you noticed, is different. The two books are compatible only at the junctions, not along straight sections.
sure, but now they will work together at a tiny cost of a few underground belts
I don't want them to work together. The extra signals could change where trains can stop which can lead to junctions being blocked which can lead to deadlock. I'd have to spend some time analyzing it to be confident that such is not the case and I'd rather not encourage the mixing anyway.
@bcwhite-code thx for the feedback, I reverted the belts, and also fixed two unpowered mine drills