beamer-bridge / beamer

Beamer - Bridging rollups with L1 inherited security
https://beamerbridge.com
MIT License
44 stars 21 forks source link

UX Audit Feedback #1132

Closed manuelwedler closed 1 year ago

manuelwedler commented 2 years ago

I'm dropping here the feedback that I got during the UX audit of our dapp at devcon. @olympe-silve please have a look at it and think about on what you agree and disagree. We can have a meeting to discuss it when I'm back from vacation.

Sorry for the long list. If I have time tomorrow I will try to group everything better.

General

Transfer walkthrough:

Most important point: Show the steps that a user has to do after clicking transfer in an overlay on top of the transfer tab. There actually only two steps (our step component has 4 but the user only interacts in two of these). Use actual numbers for the steps (1. - 2.). Use a verb that explains what the user has to do. Instead of "Waiting for transaction confirmation", use "Sign allowance transaction" or something similar.

Transfer tab

Activity tab

Provide feedback form:

GabrielBuragev commented 1 year ago

After thoroughly discussing the feedback provided by the auditor, we came up with solutions and disagreements which are written down in #1198. @manuelwedler can we close this in favor of #1198 ?

manuelwedler commented 1 year ago

Yes, don't need this anymore