Hydro budgets are enforced over the entire horizon including the spinup/lookahead timepoints. This may result in mismatch between the budgets and actual generation over the non-spinup/lookahead timepoints. This can be fixed by adding additional constraints to enforce the budget over the non-spinup/lookahead timepoints as well.
Hydro budgets are enforced over the entire horizon including the spinup/lookahead timepoints. This may result in mismatch between the budgets and actual generation over the non-spinup/lookahead timepoints. This can be fixed by adding additional constraints to enforce the budget over the non-spinup/lookahead timepoints as well.