Description:
As @BeratDamar said in #641, user interfaces should be prepared for Milestone III.
On the mobile side, the mobile theme and functionalities have changed, these should be updated on Milestone III report.
Steps:
1) Recapture of updated UI.
2) Connect Them with related headers
3) Add related code links.
Description: As @BeratDamar said in #641, user interfaces should be prepared for Milestone III. On the mobile side, the mobile theme and functionalities have changed, these should be updated on Milestone III report.
Steps:
1) Recapture of updated UI. 2) Connect Them with related headers 3) Add related code links.
Reviewer: @BeratDamar Deadline: 02.01.2023 23.59