@woodworker repaired the long multicore, which was unmounted during the ConstructionWeek.
Now we should thread it downstairs (ie. leave the patch-box upstairs and thread the "loose" end downstairs, through over the door) and connect it to the rack, so we can professionally record audio from events in the lab.
@woodworker & c_ascha fixed this! Needs testing and probably moving by half a meter (not on top of the power cables but on the other side, ontop of the tubes)
@woodworker repaired the long multicore, which was unmounted during the ConstructionWeek.
Now we should thread it downstairs (ie. leave the patch-box upstairs and thread the "loose" end downstairs, through over the door) and connect it to the rack, so we can professionally record audio from events in the lab.