[ ] KITT4SME Link to the Linkedin Page in the Are you an SME page is distracting.
[ ] Lİnkedin Page of KITT4SME shows “Madrid”
AdapQuest
[ ] Can IDSIA Link be removed?
[ ] WIP means Work in Progress – some information required
[ ] The last page shows an entropy graph without no axis labels and no information.
[ ] Last page shows a graph of Critical issues. It can be sorted from largest to smallest.
[ ] None of the above option can be clicked with some other option.
[ ] A landing page of the adaptive questionnaire should be there explaining the value of the tool and what to be expected (amount of questions, types of questions, you will be redirected to ramp, …)
RAMP (ED)
[ ] Needs analysis in the display screen should be the issues coming from the AdapQuest (we know they are not there, but please be prepared)
[ ] The tools showing should be FaMS, AIQuS or whatever, what the configurator shows, but the Integrator should be recommending changes
[ ] The contract should be prepared (broadly representing the price and the payment conditions) –WUT (leading) ED (supporting)
[ ] After the payment, there should be redirecting links to the deployed solutions (we know they are not there, but be prepared)
FaMS (SUPSI)
[ ] A simplified user manual is needed, explaining 6 of Fatigue is high – how the user must interpret the results and to create value?
[ ] The graphs having “index” label which doesn’t mean anything
AIQuS
[x] A simplified user manual is needed - how the user must interpret the results and creates value?
[x] Put the value proposition upfront, with the use case document and the users manual
SADS
[ ] A simplified user manual is needed (there is already one) - how the user must interpret the results and creates value? (is it there?)
[ ] Put the value proposition upfront, with the use case document and the users manual
Website (CSIC) – Zeki Barut will communicate it
AdapQuest
RAMP (ED)
FaMS (SUPSI)
AIQuS
SADS