Closed c0c0n3 closed 2 years ago
Here's the list of components to tackle and who's responsible for writing about them.
Partner | System | Integration priority index** |
---|---|---|
ED, CSIC | Manufacturing Process Management System | TBD |
ED, VTT | RAMP Marketplace | TBD |
CSIC | Shop Floor Reconfigurator | TBD |
CSIC | Quality Control in manufacturing operations in the Pilot Line GAMHE 5.0: Micro-mechanical milling | TBD |
GINKGO | Shop Floor Anomalies Detection System | TBD |
HOL | Sensing Layer | TBD |
HOL, GATE | Worker Profiler | TBD |
HOL, WUT | Production System Profiler | TBD |
GATE | Catalogue of Qualified Training Experiences | TBD |
SUPSI | Competence Matchmaking Tool | TBD |
GATE | AI-Learn | TBD |
GATE | Techimetro | TBD |
MARTEL | Powered by FIWARE Middleware for AI | TBD |
MARTEL | Quantum Leap | TBD |
SUPSI | Fatigue Monitoring System | TBD |
SUPSI | SMEs-Oriented Platform Configurator | TBD |
SUPSI | Intervention Manager | TBD |
SUPSI | Adaptive Questionnaire | TBD |
R2M | AI for Quality Inspection Systems | TBD |
ROVI | Vision for Quality Excellence | TBD |
VTT | Digital Datasheets for Modules Composability | TBD |
** Some systems will be integrated first, some second, some third and so on and so forth. You will be informed accordingly.
We need to define an integration testing pipeline. Ideas here:
Contribs received so far:
To be excluded from the report b/c they should've not been listed as exploitable results to start with:
we have no problem to make it public
Consolidated content at:
content handed over to SUPSI, they'll drive the editing of the document to be sent to EC reviewers.
We've got to add a chapter to the 2021 Periodic Report where we detail what software each partner brings to the project and its role in the architecture.
Each partner should contribute the following content---max one page.