This PR copies the topology document that was generated as an output of workstream 1 into a formal spec document so it can be linked by the website.
The primary addition to the previous work is incorporating formal definitions from glossaries of NERC, ENTSO-E, and CIM into the topology tables. A few changes to the names listed in the tables were made in order to align with the glossaries.
This PR copies the topology document that was generated as an output of workstream 1 into a formal spec document so it can be linked by the website.
The primary addition to the previous work is incorporating formal definitions from glossaries of NERC, ENTSO-E, and CIM into the topology tables. A few changes to the names listed in the tables were made in order to align with the glossaries.