Open Pierre-VF opened 11 months ago
The current topology ( https://github.com/carbon-data-specification/Power-Systems-Data/blob/main/specifications/cdsc-wg2-01.md ) is ISO/TSO-oriented. However, it is not excluded that some of these tools will be relevant at the DSO level.
Do we explicitly keep the distribution level out of scope? Or should we allow for space in the topology for this as well?
Upsides of integrating distribution:
Downsides:
The current topology ( https://github.com/carbon-data-specification/Power-Systems-Data/blob/main/specifications/cdsc-wg2-01.md ) is ISO/TSO-oriented. However, it is not excluded that some of these tools will be relevant at the DSO level.
Do we explicitly keep the distribution level out of scope? Or should we allow for space in the topology for this as well?
Upsides of integrating distribution:
Downsides: