Closed ggrimes closed 2 years ago
For episode 1 add work folder structure to key points.
Episode 1 still needs this added, along with an exercise to look at the .nextflow.log file, which is in the objectives.
This is being moved to the checkpointing and caching episode
For episode 1 add work folder structure to key points.