ciriajasa / DED

0 stars 0 forks source link

C-23-M-G-PM-REG-0001_Master Document Register #2

Open ciriajasa opened 1 year ago

ciriajasa commented 1 year ago

No doc : C-23-M-G-PM-REG-0001 Tittle Master Document Register DED MRF & TS - Kab. Malang

Master Document Register Last Update 03 Mar 23 https://docs.google.com/spreadsheets/d/1Bbc40lI_OMxfzf_aGXHBPkmZlKf8FViN/edit?usp=share_link&ouid=116291422275795636607&rtpof=true&sd=true

Follow this Link to Open Document

Native : https://drive.google.com/drive/folders/1eu5l1vKLPrMy6LDvXh4H8mPhIfkwlzrB?usp=share_link PDF : https://drive.google.com/drive/folders/1JcqKhonb-YzJJl-PpLL7r0AsMCrJwK2i?usp=share_link Feedback : https://drive.google.com/drive/folders/1PrkF7HeLgtYozHRsoqFqvMo7MjQ3BljE?usp=share_link Approval Doc : https://drive.google.com/drive/folders/1h7RAH47tve94ITmpZUkeOh7ggVwP37u3?usp=share_link

**Note : Display/view from Microsoft Word will be different from the Display/view of Google Word. To edit native, please download the original file.

ciriajasa commented 1 year ago

MDR revision A, with Status IFR (Issued For Review) has been summited to Project owner, Transmittal No : Transmittal C-23-M-DED-TS-001 Click to download document Date 07 Feb 2022

Image

ciriajasa commented 1 year ago

Dear All TA, berikut MDR terbaru update 11 Feb 23, agar MDR ini di Breakdown sesuai Disiplin masing-masing @prabowopho @annacatharinas

https://docs.google.com/spreadsheets/d/1zo3mD5XmhfGsfc4iPnjHF28_Jq5hd3Ie/edit?usp=share_link&ouid=116291422275795636607&rtpof=true&sd=true

ciriajasa commented 1 year ago

Dear All TA, berikut Feedback dari PO 15 Feb 23, agar MDR ini segera release mohon masukannya kembali Terima kasih :
Klik Link berikut untuk melihat feedback PO : https://drive.google.com/open?id=108whOgbq3umFJYoIuIdRLynheVE9V2H9&authuser=vikki.frind%40gmail.com&usp=drive_fs @prabowopho @annacatharinas @kadarismancec @dionysiustriprijoa @kadarismancec @agungsiswahyudi @bektiprihatiningsih @ratribayu

Image

kadarismancec commented 1 year ago

@ciriajasa Feedback dari TA Hydrology, No. C-23-M-D-CV-CAL-0001. Analysis Hidrologi termasuk analysis data hujan dari tiga stasiun terdekat dg pengujian data, analisa frekwensi, distribusi, kecocokan distribusi, perhitungan hujan rencana, intensitas hujan rencana, dan menggunakan methode hidrograf satuan, menghitung besaran banjir rencana. Dari debit banjir rencana dan potongan melintang dan memanjang titik sungai ditinjau, dapat diketahui ketinggian muka air banjir.


Hydrological analysis including analyzing rainfall data from three nearest stations by testing the data, frequency analysis, distribution, goodness of fit, calculating planned rainfall, planned rainfall intensity, and using the unit hydrograph method to calculate the planned flood magnitude. By reviewing the design flood discharge and cross-sectional and longitudinal points of the river, the floodwater level can be determined.

ciriajasa commented 1 year ago

berikut Feedback dari PO 17 Feb 23, agar MDR ini segera release mohon masukannya kembali Terima kasih

Klik Link berikut untuk melihat feedback PO : https://drive.google.com/file/d/1YnP_tmsbZJH0X-lz8aiaaLSuuyt36eL0/view?usp=share_link @prabowopho @annacatharinas @dionysiustriprijoa @kadarismancec @agungsiswahyudi @bektiprihatiningsih @ratribayu @novitapn @gunawanwb

Image

dionysiustriprijoa commented 1 year ago
  1. Data estimasi traffic dari BI dibutuhkan segera untuk kepent. analisa struktur terdiri dari max ritation dan wight load)
  2. material dan technical spec. yang disusun nanti memang terdiri dan syarat dan rencana kerja (didalamnya ada metode konstruksi)
  3. Semua data estimasi seperti size, weight, rotating, placement, vibration machine dari BI yang berhubungan dengan conveyor dan large baller dibutuhkan segera to kepent anal. struk
prabowopho commented 1 year ago

Terima kasih pak Dion, No. 1 : dapat disampaikan pada inquiry list No. 2 : material & technical spec semua disiplin akan masuk dalam doc Material and Technical Specifications, ini sbg doc untuk tender konstruksi. No. 3 : hal yang berkaitan dengan vendor atau konsultan lain (dalam hal ini hanya ada vendor) akan dimasukkan ke dalam Interface Registre.

ciriajasa commented 1 year ago

Feedback dari PO tanggal 23 Feb 23 Sebagai Berikut : https://drive.google.com/file/d/17vz_3urQp8JL_LsohO5F51FoAyqc_gfS/view?usp=share_link Need TA Response : @prabowopho @annacatharinas @gunawanwb @agungsiswahyudi

Image

prabowopho commented 1 year ago

lightning protection & grounding system memang kita hapus document nya, nanti ditambahkan di doc electrical calculation ini. tapi sebelum itu perlu diskusi dg TA Electrical.

Untuk WTP, WWTP mohon konfirmasi dari WTP Eng, apakah kita akan menggunakan tipe struktural atau portable / fabrikator ? selain dg struktur, WTP dan WWTP akan integrasi dg arsitektur, civil, dan elektrikal dsb.

untuk hazardous waste storage akan didiskusikan internal di hari sabtu.

ciriajasa commented 1 year ago

MDR revision C, with Status IFR (Issued For Review) has been summited to Project owner, Transmittal No : TS-015

Image

ciriajasa commented 1 year ago

MDR revision D, with Status IFR (Issued For Review) has been summited to Project owner, Transmittal No : TS-027

Image

ciriajasa commented 1 year ago

Doc Has been Approved by PO - 02 May 23 (BI-TS-0001)

Image